The split point
Artist fee plus show expenses plus promoter profit on those expenses. Below it, you get the guarantee. Above it, the backend starts. It is the single most commonly miscalculated figure in live music.
Signature module
A show fee is almost never a number. It is a structure, and the structure decides whether €12,000 is a good night or a bad one.
Components, not deal types
| Shape | What it means | Components |
|---|---|---|
| Flat guarantee | A fixed fee regardless of sales | guarantee |
| Versus | The guarantee or a percentage, whichever is greater | guarantee · percentage · max() |
| Guarantee plus backend | A fee, then a share above the split point | guarantee · split point · backend share |
| Door deal | A percentage of the door, often with a floor | percentage · minimum |
| Scaled with bonuses | Extra at capacity thresholds | guarantee · bonus at threshold |
On top of any of those, show.institute carries buyouts (production, travel, hospitality, backline), deductions (withholding tax, VAT, facility fee, card commission, promoter profit on expenses, merch venue cut) and conditions (radius, billing, curfew, exclusivity) as separate lines rather than as notes in a free-text box. Every one of them is checked at settlement.
Before you sign
Artist fee plus show expenses plus promoter profit on those expenses. Below it, you get the guarantee. Above it, the backend starts. It is the single most commonly miscalculated figure in live music.
The ticket count at which your backend actually begins. If it is above capacity, the backend is decoration and you should be negotiating the guarantee instead.
What the artist actually leaves with, at any attendance you assume, after every deduction — including estimated withholding in that territory.
After the show
show.institute compares the promoter's sheet against the deal memo as it stood at confirmation — not as later edited. Amendments are versioned, so what you agreed stays what you agreed.
| Check | What it catches |
|---|---|
| Ticket counts by scale against reported gross | Comps counted as sold, or sold counted as comp |
| VAT rate applied | Wrong rate, or VAT deducted twice |
| Facility fee per ticket × tickets | Fee charged on complimentary tickets |
| Declared expenses against the agreed cap | Expenses inflated to raise the split point |
| Promoter profit rate | 20% charged where 15% was agreed |
| Split point arithmetic | The most common error of all |
| Backend share rate | 80/20 paid where 85/15 was agreed |
| Withholding rate and basis | Withheld on gross where the position allows net |
| Merchandise cut and its basis | Venue cut applied to gross rather than net of VAT |
| Currency and conversion date | Converted at a rate other than the agreed date |
Built properly
Every amount in show.institute is stored in integer minor units, from the offer through the settlement to the statement. Exchange rates are held with the date they applied and never re-derived, so a P&L from last March does not quietly change this March.
These sound like implementation details. They are the difference between a ledger that survives an audit and one that produces a different answer each time you open it.