show.institute Sign up

Signature module

The arithmetic nobody does at 1am in a venue office.

A show fee is almost never a number. It is a structure, and the structure decides whether €12,000 is a good night or a bad one.

Components, not deal types

Real deals compose. A fixed list of deal types does not survive contact with a promoter.

Deal shapes and the components that express them
ShapeWhat it meansComponents
Flat guaranteeA fixed fee regardless of salesguarantee
VersusThe guarantee or a percentage, whichever is greaterguarantee · percentage · max()
Guarantee plus backendA fee, then a share above the split pointguarantee · split point · backend share
Door dealA percentage of the door, often with a floorpercentage · minimum
Scaled with bonusesExtra at capacity thresholdsguarantee · bonus at threshold

On top of any of those, show.institute carries buyouts (production, travel, hospitality, backline), deductions (withholding tax, VAT, facility fee, card commission, promoter profit on expenses, merch venue cut) and conditions (radius, billing, curfew, exclusivity) as separate lines rather than as notes in a free-text box. Every one of them is checked at settlement.

Before you sign

Three numbers you should never agree a deal without

The split point

Artist fee plus show expenses plus promoter profit on those expenses. Below it, you get the guarantee. Above it, the backend starts. It is the single most commonly miscalculated figure in live music.

Break-even attendance

The ticket count at which your backend actually begins. If it is above capacity, the backend is decoration and you should be negotiating the guarantee instead.

Walkout potential

What the artist actually leaves with, at any attendance you assume, after every deduction — including estimated withholding in that territory.

After the show

Ten checks against the memo, every settlement

show.institute compares the promoter's sheet against the deal memo as it stood at confirmation — not as later edited. Amendments are versioned, so what you agreed stays what you agreed.

Settlement reconciliation checks and the failures they catch
CheckWhat it catches
Ticket counts by scale against reported grossComps counted as sold, or sold counted as comp
VAT rate appliedWrong rate, or VAT deducted twice
Facility fee per ticket × ticketsFee charged on complimentary tickets
Declared expenses against the agreed capExpenses inflated to raise the split point
Promoter profit rate20% charged where 15% was agreed
Split point arithmeticThe most common error of all
Backend share rate80/20 paid where 85/15 was agreed
Withholding rate and basisWithheld on gross where the position allows net
Merchandise cut and its basisVenue cut applied to gross rather than net of VAT
Currency and conversion dateConverted at a rate other than the agreed date
Every variance is a conversation, not a correction. show.institute shows the agreed value, the settled value, the difference and the euro impact, with the clause and the settlement line side by side. A human decides, and the decision is recorded against the show.

Built properly

Money is never a floating-point number

Every amount in show.institute is stored in integer minor units, from the offer through the settlement to the statement. Exchange rates are held with the date they applied and never re-derived, so a P&L from last March does not quietly change this March.

These sound like implementation details. They are the difference between a ledger that survives an audit and one that produces a different answer each time you open it.